错误:错误的SQL字符串 update user_pro_en set hots= hots+1 where ID=10 Flame starting system-Shuanghuan Electric Manufacturing Co., Ltd., Nanjing
 Monitor series
 Gauge assemblies
 Temperature gauge.pressure meter
 Speedometer.Ammeter.voltmeter
 Pressure sensor.Pressure switch
 Temperature sensor.Thermo switch
 Fuel gauge sensor
 Rotational speed sensor &speed sensor
 Flame starting system
 Switch series
 Ignition lock.Voltage regulators & Flasher
 The Others
Address: East of Building 5, No. 276, Lidao Road, Qixia District, Nanjing
Zip Code: 210046
Tel: (025) 85307752/85575032
Fax: (025) 85575030
          Detail Current Position:HomePage->Detail 
Flame starting system
posttime:2010-3-26  Font 〖 B M S 〗  Readtime:10058   [Close]


Manual flame preheating plugs




  Power on to preheat the preheating plug, 15 to 25 seconds later, the engine starts, the preheating
plug’s oil way opens automatically to torch and heat the air intake of the engine.  After the engine start
, power off, and then the preheating plug’s oil way will close automatically. The post-heating is also
done according to the environment temperature
, whose duration is controlled by the power supply switch. The post-heating duration is generally
compliant with the  list.

温度.Temperature(ºc)

-10~0

-20~-10

-30~-20

-30~

时间(分).Duration (minutes)

0.5

1

1.5

2



Articles Page:1 2 
All rights reserved Nanjing Shuanghuan Electric Manufacturing Co., Ltd.
Address: Nanjing Economic and Technological Development Zone Heng Jing Road 23 Zip: 210046 Tel: (025) 85307752/85575032 Fax: (025) 85,575,030
苏ICP备11043168号-1